Mike's Restoration

Post Hole Digging & Concrete Work

Machine-augered holes for fences, decks, pergolas and signs, plus footings, sonotubes, pads and small slabs. We dig to the right depth, set posts plumb and square, and pour clean. Spoil and debris leave with us.

Post Hole Digging & Concrete in the Greater Toronto Area

Benefits

Why homeowners book post hole digging & concrete with us

  • Machine-augered holes to frost depth
  • Sonotubes and structural footings
  • Deck, pergola, fence and sign posts
  • Small pads, walkways and slab pours
  • Posts set plumb, square and on-spec
  • Spoil and debris removed from site

Before & after

Recent jobs across the GTA

Two-car garage, Scarborough beforeBefore
Two-car garage, Scarborough afterAfter
Two-car garage, ScarboroughCompleted in 2h 40m
Backyard teardown, Ajax beforeBefore
Backyard teardown, Ajax afterAfter
Backyard teardown, AjaxCompleted in 3h 10m

FAQ

Post Hole Digging & Concrete questions, answered

How deep do you dig?
Standard is four feet to clear the frost line, deeper where the build requires it.
Do you locate utilities first?
Yes — locates are arranged before any auger touches the ground.
Can you pour just the footings?
Yes, we regularly do footing-only work for builders and homeowners doing their own framing.
Do you work in tight backyards?
Our equipment fits through standard gates, so most backyards are no problem.

Get started

Book post hole digging & concrete in under 2 minutes

Call, text us photos for a free quote, or book online — whatever's fastest for you.